BPA Fish and Wildlife FY 1998 Proposal
Section 1. Summary
Section 2. Goals
Section 3. Background
Section 4. Purpose and methods
Section 5. Planned activities
Section 6. Outcomes, monitoring and evaluation
Section 7. Relationships
Section 8. Costs and FTE
see CBFWA and BPA funding recommendations
Section 1. Summary
Title of project
Monitoring Smolt Migration of Wild Snake River Sp/Sum Chinook
BPA project number 9102800
Short description
Collect time series information to examine migrational characteristics of wild ESA-listed Snake River chinook salmon stocks. Mark wild spring/summer chinook salmon parr with PIT tags; intercept and decode tagged smolts as they pass Snake and Columbia River dams.
Business name of agency, institution or organization requesting funding
National Marine Fisheries Service
Proposal contact person or principal investigator
|
Sub-contractors |
Section 2. Goals
General
Adaptive management (research or M&E)
Target stock | Life stage | Mgmt code (see below) |
Bear Valley Ck./spr/sum chinook salmon | Parr | W(L) |
Elk Ck./spr/sum chinook salmon | Parr | W(L) |
Cape Horn Ck./spr/sum chinook salmon | Parr | W(L) |
Marsh Ck./spr/sum chinook salmon | Parr | W(L) |
Sulphur Ck./spr/sum chinook salmon | Parr | W(L) |
Big Ck. /spr/sum chinook salmon | Parr | W(L) |
Lake Ck./spr/sum chinook salmon | Parr | W(L) |
W. Fork Chamberlain Ck../spr/sum chinook salmon | Parr | W(L) |
Secesh R./spr/sum chinook salmon | Parr | W(L) |
Valley Ck. /spr/sum chinook salmon | Parr | W(L) |
E. Fork Salmon R./spr/sum chinook salmon | Parr | W(L) |
Herd Ck./spr/sum chinook salmon | Parr | W(L) |
S. Fork Salmon R./spr/sum chinook salmon | Parr | W(L) |
Rush Ck. /spr/sum chinook salmon | Parr | W(L) |
Camas Ck./spr/sum chinook salmon | Parr | W(L) |
Loon Ck./spr/sum chinook salmon | Parr | W(L) |
Chamberlain Ck./spr/sum chinook salmon | Parr | W(L) |
Affected stock | Benefit or detriment |
Wild summer steelhead in Salmon R. | Beneficial--PIT tagged for IDFG |
Sculpin | Unknown |
Section 3. Background
Stream area affected
Stream name 17 streams of the Salmon River
Stream miles affected 46
Hydro project N/A Unknown, probably all FCRPS hydroelectric projects to some extent.
Land ownership public
Habitat types N/A Anadromous wild fish populations.
History
The National Marine Fisheries Service (NMFS) initiated a cooperative study with the U.S. Army Corps of Engineers (COE) in 1988 to PIT tag wild Snake River spring/summer chinook salmon parr as part of the COE transportation research program. This project continued through mid-1991, with outmigrating smolts monitored during spring and summer 1989-1991 as they passed Lower Granite, Little Goose, and McNary Dams. Beginning in 1992, this work became part of the BPA-funded Fish and Wildlife Program, and a 6-year study to examine the migrational characteristics of wild, ESA-listed Snake River spring/summer chinook salmon over a series of years spanning different environmental conditions was initiated. The study involves collecting and PIT tagging wild parr in their natal streams during summer and monitoring them as they pass downstream through the hydropower complex the following spring. The study also provides data for real-time management decisions in relation to flow augmentation, spill, and transportation efforts.
Biological results achieved
Results have demonstrated that migration timings of wild smolts differ markedly from those of hatchery smolts. Wild migrations tend to vary considerably between years and streams and are protracted, whereas those of hatchery fish are consistent within groups and between years and tend to be constricted. The overall timings of wild fish migrations also appear to be heavily influenced by seasonal climatic conditions and water temperatures, particularly during the early portions of the outmigrations, whereas those of hatchery fish are not. In addition, the data has been invaluable to NMFS and the Fish Passage Center for managing these ESA-listed stocks, particularly during periods of unfavorable flow conditions when the ability to mark migrating fish at river traps is decreased.
Project reports and papers
A series of quarterly and annual reports under the title "Monitoring the Migrations of Wild Snake River Spring/Summer Chinook Salmon Smolts" have been produced by this project. The BPA publication numbers for the Annual Report series follow:
Annual Report 1992 DOE/BP-18800-1 September 1994
Annual Report 1993 DOE/BP-18800-2 January 1995
Annual Report 1994 DOE/BP-18800-3 September 1995
Annual Report 1995 DOE/BP-18800-4 September, 1996
Annual Report 1996 DOE/BP-18800-5 (draft)
A paper detailing results of similar studies conducted from 1989 through 1991 under COE funding has been published by the North American Journal of Fisheries Management (May 1996).
Adaptive management implications
Information gained from this project has proved invaluable to NMFS and the Fish Passage Center for managing these ESA-listed stocks, particularly during periods of low flow conditions. For example, data from wild fish migrations indicate water reserved for fish migrations may benefit wild fish in most years if it is released after about mid-May, particularly in low flow years.
Section 4. Purpose and methods
Specific measureable objectives
Gather data related to smolt migrational timings of individual and combined populations of wild fish and environmental conditions within the streams. Provide information on a yearly basis and determine differences between years related to seasonal climatic conditions and environmental conditions within the streams. This information is necessary for NMFS and the Fish Passage Center for managing these ESA-listed and other stocks, particularly during drought conditions.
Critical uncertainties
As long as adequate numbers of wild chinook parr can be PIT tagged and PIT-tag monitoring systems operate at the dams during spring and summer each year, the probability of accomplishing the stated major objectives is very high. Adequate numbers of wild chinook salmon parr for tagging is critical. There are always risks when collecting and tagging fish; however, overall mortality from collecting and tagging is expected to be less than 2% (based on previous data). Mortality for other species inadvertantly collected also is expected to be less than 2%.
Biological need
Information on wild Snake River spring/summer chinook salmon migratory behavior during the smolt migrations are of paramount importance for protection of these fish through inseason management decisions related to flow augmentations, dam operations including spill, and transportation.
Hypothesis to be tested
Null Hypothesis (Ho): Run-time distributions at Lower Granite Dam are not significantly different within years among wild spring/summer chinook salmon smolt populations in the Snake River drainage.
Corollary: If the null hypothesis is rejected, it is highly likely that run-timing to Lower Granite Dam is different among wild populations within years in the Snake River and that these differences may be influenced by factors such as temperature, flow, or genetics.
Criteria for rejecting Ho: The null hypothesis will be rejected if run-timing is significantly different among populations by re-sampling methods. Significance will be set at P<0.05.
Null Hypothesis (Ho): Run-time distributions for fish from individual or combined streams or tributaries at Lower Granite Dam are not significantly different among years. Significance will be set at P < 0.05.
Corollary: If the null hypothesis is rejected, it is highly likely that run-timing of individual streams or tributaries is different among years and that these differences may be influenced by other factors such as temperature or flow.
Criteria for rejecting Ho: The null hypothesis will be rejected if run-timing of individual streams or tributaries is different among years by re-sampling methods. Significance will be set at P<0.05.
Alternative approaches
N/A. No alternative approaches necessary.
Justification for planning
N/A. This is an on-the-ground effort to benefit fish. Only NMFS, 2 coordinators.
Methods
1) Chinook salmon parr are collected in 17 streams of the Salmon River drainage in July and August of each year using backpack electrofishers and seines. Portable PIT-tagging stations are used for tagging fish and are designed specifically for use beside streams in the field. Station components, setup, and PIT-tagging techniques have been described by Prentice et al. in Fish-Marking Techniques, American Fisheries Society Symposium 7 Manual. Fish are dipped from live cages with sanctuary dip nets and poured into plastic pans containing anesthetic; after anesthetization, chinook salmon parr greater than 54 mm in fork length are PIT tagged. Fish are allowed to recover after tagging for a minimum of 0.5 h before release into the stream at the same location where they were collected. About 10% are held in live cages for 24-h for delayed mortality and tag loss information.
2) Surviving PIT-tagged wild chinook salmon smolts are subsequently detected at downstream dams the following spring and summer. The following statistical analyses have been used in Annual Reports.
a. Length distributions (at tagging) vs. length distributions for detected fish (at tagging)---Chi-square.
b. Mean length at tagging vs. length of detected fish (at tagging), overall and during segments of the outmigration---one and two-sample Z-tests.
c. Diel timing at dam fish facilities---Chi-square.
d. Comparison of detection rates at dams for fish PIT tagged and released under different water temperature scenarios---two-sample Z-tests.
e. Comparison of arrival timing distributions for fish from individual streams at Lower Granite Dam---Student-Newmann-Keuls multiple comparison method.
3) Wild Snake River spring/summer chinook salmon are used in this study. The minimum number of wild fish PIT tagged per stream is about 1,000; the maximum about 3,000. This produces about 30-300 smolts detected at Lower Granite Dam for timing purposes.
Section 5. Planned activities
Phase Planning | Start 6/1991 | End ongoing | Subcontractor |
Continue to assess the migrational characteristics of wild Snake River spring/summer chinook salmon smolts from selected streams. | |||
Phase Implementation | Start 12/1993 | End 2005 | Subcontractor |
Continue to document and assess what environmental factors control migrational timings of wild spring/summer chinook salmon. | |||
Phase O&M | Start 4/1992 | End ongoing | Subcontractor |
Continue to provide data for inseason management decisions related to flow augmentation, spill, and transportation. |
Constraints or factors that may cause schedule or budget changes
Factors that may cause schedule or budget changes are: continued issuance (or not) of an Idaho state collectors permit, the number of wild chinook salmon parr available to tag each year, and change in the status of existing PIT-tag monitoring systems at the dams.
Section 6. Outcomes, monitoring and evaluation
SUMMARY OF EXPECTED OUTCOMES
Expected performance of target population or quality change in land area affected
The study will provide basic information for management of hydrosystem operations to improve the survival of ESA-listed Snake River wild spring/summer chinook salmon as they pass through the FCRPS. These efforts started in 1992 and are continuing.
Present utilization and convservation potential of target population or area
The ultimate conservation potential would be to restore listed Snake River wild spring/summer chinook salmon to allow a sustainable harvest in the fisheries in conjunction with healthy sustainable reproductive populations. Time frame 10-30 years from now.
Assumed historic status of utilization and conservation potential
The assumed conservation potential for the return of adult wild spring/summer chinook salmon to the Snake River based on historic information prior to 1970, would be 50,000 to 79,000 fish with an average return rate of 4.4%. Historic utilization perhaps was 50%. Time frame for accomplishment 10-30 years.
Long term expected utilization and conservation potential for target population or habitat
Same answer as given in B. Time frame 10-30 years.
Contribution toward long-term goal
Improved information for management of hydrosystem operations to improve the protection and passage survival of ESA-listed Snake River wild spring/summer chinook salmon as they pass through the FCRPS. This has occurred since 1992 and continues to improve as yearly data becomes available.
Indirect biological or environmental changes
Man-made environmental changes to the river that could be made from information provided by this project, indirectly, may be such things as alterations or removal of some dams, and habitat improvement projects. Time frame 5-50 years.
Physical products
Numbers of wild chinook salmon parr to be PIT tagged per year would be 10,000 to 30,000.
Environmental attributes affected by the project
Information from this project already is used to request increases in flow for the water budget for wild fish during the out-migration. Environmental monitors in streams could indicate water pollution, etc. which may directly or indirectly affect human use of the land adjacent or upstream.
Changes assumed or expected for affected environmental attributes
Changes for affected environmental attributes would only occur if a problem was detected by our environmental monitors.
Measure of attribute changes
N/A-- Turbidity will be measured in selected streams over time, 1996-?
Assessment of effects on project outcomes of critical uncertainty
Unquantifiable.
Information products
Information on wild Snake River chinook salmon migratory behavior during smolt migrations are of paramount importance for protection of these fish through inseason management decisions related to flow augmentations, dam operations including spill, and transportation.
During the first 4 years, we have gathered valuable and unique data related to the smolt migrational timings of individual and combined populations of wild fish. We have determined that timings of wild fish differ markedly from those of hatchery fish. Wild migrations tend to vary considerably between years and streams and are protracted, whereas those of hatchery fish are consistent within groups and between years and tend to be constricted. The overall timings of wild fish migrations also appear to be heavily influenced by seasonal water temperatures, particularly during the early portions of the outmigrations, whereas those of hatchery fish are not. In addition, the data proved invaluable to NMFS and the Fish Passage Center from 1992-1994 for managing these ESA-listed stocks, particularly during drought conditions. This need will continue into the foreseeable future.
In 1994, environmental monitoring systems were installed in several selected streams to provide data which will be used to determine what environmental factors influence the migrational timings of wild chinook smolts.
Coordination outcomes
Extensive coordination between IDFG, ODFW, Nez Perce Tribe, UofI, and Sho-Ban Tribe has occurred over the course of this study, before, during, and after field work. Overall, coordination outcomes were successful and positive.
MONITORING APPROACH
The region should measure the project's biological or environmental outcomes by: 1) accessing DART on the Internet for real-time information on wild fish migrations during the out-migration, 2) directly downloading PIT-tag detection information for wild fish from the PTAGIS database at the Pacific States Marine Fisheries Commission (PSMFC), and 3) Fish Passage Center (FPC) weekly reports, progress, and annual reports from this project.
Provisions to monitor population status or habitat quality
This project is designed to monitor timing of wild Snake River spring/summer chinook salmon smolts at dams and to determine what factors may affect timing; other BPA projects, States, and Federal Agencies closely monitor actual stock populations over time.
Data analysis and evaluation
Same as answers 2a through 2e, under METHODS; also in addition, we will analyze arrival timing distributions at Lower Granite Dam for fish from individual and combined streams between years, probably after at least 5 years of data. We will probably use the Student-Newmann-Keuls multiple comparison method.
Information feed back to management decisions
Same as the first answer under Monitoring Approach
Critical uncertainties affecting project's outcomes
Physical numbers of chinook salmon parr available for PIT tagging from year to year will continue to be a critical uncertainty that little can be done about in the short term. However acquisition of State of Idaho collectors permits and continued operation of the PIT-tag monitoring systems at the dams can be assured through regional consensus and appropriate funding.
Evaluation
The adaptive management approach that uses wild fish timing information at the dams, both real-time and retrospective, to dictate when to use water set aside for fish during the out-migration, how to operate dams with respect to spill, transportation, bypass, etc. to benefit wild fish from year-to-year. The ultimate success of such management measures could eventually be evaluated (in part) by adult returns.
Incorporating new information regarding uncertainties
Unknown.
Increasing public awareness of F&W activities
The public will only become aware of important results from this study on wild fish migrations and its implications, by public meetings, newspapers and other media, and reports. Only in this way will the public realize what is being done in the region to enhance fish.
Section 7. Relationships
Related BPA project | Relationship |
9302900 Survival Estimation for Dam/Reservoir Passage | fish used in survival estimates at downstream dams. |
9102800 Monitoring Smolt Migration of Wild Snake River Sp/Sum Chinook | fish used in survival estimates at downstream dams. |
9107300 Idaho Natural Production Monitoring and Evaluation 83-7(esa) | Intensive eval. and monitoring of fish in adjacent streams to those covered by 9102800. |
8909800 Idaho Supplementation Studies (iss) | information used by this study in certain streams for background info. for supplementation. |
9102800 Monitoring Smolt Migration of Wild Snake River Sp/Sum Chinook | information used by this study in certain streams for background info. for supplementation. |
9202604 Spring Chinook Salmon Early Life History | information includes some Oregon streams. |
9102800 Monitoring Smolt Migration of Wild Snake River Sp/Sum Chinook | information includes some Oregon streams. |
Related non-BPA project | Relationship |
Steelhead Supplementation Studies in Idaho Rivers/IDFG | Monitoring wild PIT-tagged steelhead at downstream dams. |
Spring Chinook Salmon Early Life History/ODFW | Monitoring wild PIT-tagged spr/sum chinook salmon from northeast Oregon |
Opportunities for cooperation
Continued close coordination with and cooperation by the Idaho Department of Fish & Game (IDFG) is important, including the continued issuance of state collector permits. Also, when requested by IDFG, this project PIT tags wild steelhead for continuing BPA projects such as 9005500 or 9107300. In addition, collecting gear and PIT tag equipment have been reciprocally shared with project 9107300 and 8909803.
Section 8. Costs and FTE
1997 Planned $303,800
Future funding needs | Past obligations (incl. 1997 if done) | |||||||||||||||||||||||||||||||||||||||||||||
|
|
FY | Other funding source | Amount | In-kind value |
1998 | NMFS | NA | $25,000 |
1999 | NMFS | NA | $25,000 |
2000 | NMFS | NA | $25,000 |
2001 | NMFS | NA | $25,000 |
2002 | NMFS | NA | $25,000 |
Other non-financial supporters
IDFG, ODFW, USFWS, Nez Perce Tribe, Sho-Ban Tribe, UofI.
FY97 overhead percent 15-20% depending on the percentage of total costs of any one year that cover labor.
How does percentage apply to direct costs
That percentage is of the total costs. Overhead is applied at a rate of 45.6 % of total direct labor only.