BPA Fish and Wildlife FY 1998 Proposal
Section 1. Summary
Section 2. Goals
Section 3. Background
Section 4. Purpose and methods
Section 5. Planned activities
Section 6. Outcomes, monitoring and evaluation
Section 7. Relationships
Section 8. Costs and FTE
see CBFWA and BPA funding recommendations
Section 1. Summary
Title of project
Libby Reservoir Mitigation Plan
BPA project number 9500400
Short description
Compile loss/gain statement, Libby fisheries mitigation options and site plans, criteria for selecting and prioritizing mitigation projects, for public scoping and submittal to NPPC. Initiate pilot projects for long-term guidance.
Business name of agency, institution or organization requesting funding
Montana Department of Fish, Wildlife & Parks
Proposal contact person or principal investigator
|
Sub-contractors |
Section 2. Goals
General
Supports a healthy Columbia basin; program coordination or planning; plan for program to achieve all above goals
Target stock | Life stage | Mgmt code (see below) |
Endangered Kootenai white sturgeon | All, with special emphasis on spawners, eggs and sudyearlings | (L), A, N |
Bull trout | All | (P), N, W |
Kootenai River burbot | All | N, W |
Westslope cutthroat | All | N |
Interior redband mountain whitefish | All | W, A |
Rainbow trout | All | W, N |
Affected stock | Benefit or detriment |
Torrent and spoonhead sculpins | Beneficial |
Northern squawfish | Detrimental |
Section 3. Background
Stream area affected
Stream name Kootenai River
Stream miles affected Approx. 200
Hydro project Libby Dam
Project is an office site only X
Land ownership both
Acres affected entire basin in Montana
Habitat types Reservoir, river, tributary, lake, pond.
History
Public scoping, project site selection and loss/gain assessment began in 1995. CSKT and MFWP produced a draft document in 1996. Four public meetings were held in Libby and Eureka. Two more are scheduled for spring 1997. Public input will be incorporated into the plan before submittal to NPPC during spring 1997. Pilot projects will begin in 1997.
Biological results achieved
Planning phase only.
Project reports and papers
Draft of loss/gain statement, criteria for project selection and list of proposed projects is on file at MFWP.
Adaptive management implications
Libby Fisheries Mitigation Plan will guide mitigation activities under project 8346700.
Section 4. Purpose and methods
Specific measureable objectives
(1) Prepare a mitigation plan to compensate for fisheries losses due to the construction and operation of Libby Dam including loss/gain statement, criteria for project prioritization and list of mitigation options. (2) Stimulate public interest in the Kootenai Drainage using education measures, public scoping meetings and a citizens advisory committee.
Critical uncertainties
The timing of submittal to NPPC is subject to funding and efficiency of personnel. Note: No new personnel have been hired to complete the plan. Everything accomplished to date has been done with no additional funding. This project will facilitate the planning process by initiating demonstration projects and enhancing public involvement. No risks to date.
Biological need
Mitigation for the construction and operation of Libby Dam is called for by the NPPC program. Libby Reservoir and upper Kootenai River in British Columbia contains what may be the most viable metapopulation of bull trout in existence. The Kootenai River downstream contains the last vestige of the endangered Kootenai white sturgeon. Despite introduced fish species, the drainage remains relatively pristine. Headwaters remain relatively pristine and contains functioning ecosystems and species diversity that can be used as a source for repairing past damages in other areas. Today, man�s activities have effected nearly all areas that are not too high, steep, wet or dry, cold or hot to develop. Pristine (wild) ecosystems have become fractionated and isolated, and as such become unstable and vulnerable to cataclysmic events (e.g. fire, flood, pollution etc.). In many areas, there is no longer a nearby reserve of a like ecotype that can protect or restock an area after a cataclysm. This makes the remaining pristine areas more valuable than ever before as living laboratories and reserves of species diversity. The drainage is inhabited by grizzly bear, mountain goats, bighorn sheep, bald eagles and many endangered plants. These areas must be recognized for their scientific and biological value.
Hypothesis to be tested
See project 8346700 in reference to mitigation implementation.
Alternative approaches
Approaches will be outlined by this plan.
Justification for planning
This plan was requested by NPPC for approval before full scale mitigation can begin. However, pilot projects, site plans for larger projects and permitting processes can begin immediately. Quite frankly, nearly all identified projects could begin now if the funding were available. We are completely open to public input and project recommendations, so long as the suggestions are biologically sound. We have learned a great deal from this effort�s sister project: Hungry Horse Mitigation. This planning process is an exercise to prove to policy makers that we know what we�re doing and will be efficient with the funding when it hits the ground. If anyone has an idea as to how we can implement Libby mitigation more effectively or cost-efficiently, let me know�I�m all ears.
Entities involved are MFWP, CSKT and KTOI as per NPPC Program language. MFWP and KTOI are currently funded for projects in the Kootenai drainage. Libby Mitigation is in developmental stages, and not currently funded.
Methods
Loss statement involved digitization of inundated tributary and river habitat. Lost production of juvenile recruitment was extrapolated from pristine drainages by measurement of stream gradient, size and order. Population status was derived from ongoing research in the Kootenai Drainage. This plan will be modeled after the Hungry Horse mitigation planning and implementation documents and public scoping process. Very little statistical analysis is necessary but all such mathematical analysis will be conducted through University statistical consultation.
Section 5. Planned activities
Phase Planning | Start 1997 | End 1997 | Subcontractor None |
Plan is expected to be submitted to NPPC in December 1996 as per NPPC measures 10.3B.1 and 11. Public scoping was not complete in 1996, so we requested an extension from NPPC. Public scoping is scheduled for Feb. and Mar. 1997 in preparation for submitting the plan this spring. | |||
Phase Implementation | Start 1997 | End 1998 | Subcontractor TBA |
Implement pilot projects |
Constraints or factors that may cause schedule or budget changes
Council's review process may vary in duration.
Section 6. Outcomes, monitoring and evaluation
SUMMARY OF EXPECTED OUTCOMES
Expected performance of target population or quality change in land area affected
Libby Mitigation Plan and subsequent implementation.
Present utilization and convservation potential of target population or area
Multi use, potential for conservation high.
Assumed historic status of utilization and conservation potential
Resource extraction, frontier ethic.
Long term expected utilization and conservation potential for target population or habitat
Protect what is left. Restore what we can.
Contribution toward long-term goal
All resident fish species in Lake Koocanusa and in the Kootenai River below Libby Dam have been impacted by man's activities including hydropower development. Modifications to dam operation will help balance hydropower and fish requirements. We recognize that hydropower is more efficient and cleaner than comparable power sources available today (with similar capacity). Our "operational" mitigation recommendations, therefore seek to protect fisheries concerns while minimizing impacts to the power system. We also consider our actions in the scope of the Columbia River system as a whole watershed. The IRCs and tiered sturgeon flows are examples of this concept.
"Non-operational" mitigation strategies (measures that do not require changes to dam operation) and recommendations are designed with multiple species in mind, terrestrial and aquatic. We have developed new techniques with applicability elsewhere in the basin, and will strive to do so in the future.
Indirect biological or environmental changes
Habitat projects will benefit terrestrial species as well as aquatic.
Physical products
This will be described in the plan and future documents.
Environmental attributes affected by the project
Reservoir operation, river flows, discharge temperature, reconnection of blocked habitat, rehabilitation of lake and stream habitat.
Changes assumed or expected for affected environmental attributes
Improved reservoir and stream habitat will improve survival and growth of fish by enhancing biological productivity. Reconnecting blocked habitat will provide more spawning and rearing habitat for fluvial and adfluvial fish species. Restoration of flood plain function will improve system health. Also see above.
Measure of attribute changes
Planning only
Assessment of effects on project outcomes of critical uncertainty
Population monitoring, sampling of primary production using C14 scintillation, chlor a, zooplankton density and vertical distribution, benthic insect grabs, fish food habits, growth rate evaluation (scale and otolith), migrant trapping, riparian revegetation evaluation, hydrographic monitoring.
Information products
Libby Mitigation and Implementation Plan, site plans, permits, landowner agreements, monitoring plan.
MONITORING APPROACH
The loss statement in the mitigation plan involved digitization of inundated tributary and river habitat. Lost production of juvenile recruitment was extrapolated from pristine drainages by measurement of stream gradient, size and order. Population status was derived from ongoing research in the Kootenai Drainage. This information forms the basis of an accounting system for program accomplishments. This plan will be modeled after the Hungry Horse mitigation planning and implementation documents which were already approved by the NPPC.
Provisions to monitor population status or habitat quality
Monitoring is coordinated through the Kootenai Basin Steering Committee. This plan will include a monitoring plan.
Data analysis and evaluation
see above
Information feed back to management decisions
Adaptive management will guide future direction. Things that produce measurable results will continue, things that do not work will be modified or discontinued.
Critical uncertainties affecting project's outcomes
The main issue here is when the IRCs will be implemented. Dam operation will be a major factor in the effectiveness of non-operational mitigation measures. Effectiveness can be improved by balancing system operation to benefit resident and anadromous fish species.
We are constantly assured that the Biological Opinion is "a living document" with flexibility to change as new information becomes available, but no change in implementation has occurred. ESA actions must be based on the best available science. Policy makers should assure this occurs.
Evaluation
See above
Incorporating new information regarding uncertainties
Our track record has shown that we readily accept and adapt to new information. Scientific principal leads us to search for the truth. If we are wrong we admit it and gratefully accept the correction, this makes our product better.
Increasing public awareness of F&W activities
Public scoping, media
Section 7. Relationships
Related BPA project | Relationship |
8446500 9501200 Libby Tech. Analysis/IRC development | Modeling to link river/reservoir components. |
9500400 Libby Mitigation Plan | Provides pilot projects, assists public scoping and literature compilation to develop Libby Mitigation Plan |
9502600 Model Watershed Program | Implement Mitigation Projects |
Related non-BPA project | Relationship |
Projects 8806400, 8806500, 9401200 and 9404900: Kootenai River system projects - KTOI and IDFG | Work coordinated under Kootenai Basin Steering Committee and White Sturgeon Recovery Plan |
Opportunities for cooperation
Final form depends on NPPC approval. See Libby mitigation cooperative agreements in project 8346700. Cooperative efforts and cost-shares have already been demonstrated in public scoping, pilot projects and through state/tribal contacts. The plan will be jointly submitted by FWP, CSKT and the Kootenai Tribe of Idaho. Many projects have and will be jointly prepared with the U.S. Forest Service.
Section 8. Costs and FTE
1997 Planned $38,240
1996 Unobligated $124,067
Future funding needs | Past obligations (incl. 1997 if done) | |||||||||||
|
Other non-financial supporters
Public, sporting and conservation groups, landowners.
This project may be complete by FY98. If so, no funding will be needed.
How does percentage apply to direct costs
[Overhead % not provided so BPA appended older data.]