FY07-09 proposal 199405000
Jump to Reviews and Recommendations
Section 1. Administrative
Proposal title | Salmon River Habitat Enhancement |
Proposal ID | 199405000 |
Organization | Shoshone Bannock Tribes |
Short description | Continue to monitor and evaluate previous habitat enhancemnet efforts and the effects of mine impacts. Complete preliminary data collection and feasability studies on two new locations for habitat enhancements in the Upper Salmon River Subbasin. |
Information transfer | Trasfer of data to stream net, presentation at scientific conferences, completion of public reports, presentation at local meetings, pulication in peer-review scientific journals. The feasablitry study will be used to develop a plan to enhance areas previously impacted by mining. |
Proposal contact person or principal investigator |
Contacts
Contact | Organization | |
---|---|---|
Form submitter | ||
Heather Ray | Shoshone-Bannock Tribes of Fort Hall | [email protected] |
All assigned contacts | ||
Heather Ray | Shoshone-Bannock Tribes of Fort Hall | [email protected] |
Section 2. Locations
Province / subbasin: Mountain Snake / Salmon
Latitude | Longitude | Waterbody | Description |
---|---|---|---|
442500N | 1151730W | Bear Valley Creek | Bear Valley Creek, tributary to Middle Fork Salmon River |
440730N | 1143000W | Big Boulder Creek | Big Boulder Creek, tributary to East Fork Salmon River |
440730N | 1141500W | Herd Creek | Herd Creek, tributary to East Fork Salmon River |
450452 | 1141501 | Panther Creek | Panther Creek, tributary to Salmon River |
4401159 | 1143610 | Slate Creek | Slate Creek, tributary to Salmon River |
435023 | 1144855 | Smiley Creek | Smiley Creek, tributary to Salmon River |
442000N | 1144232W | Yankee Fork Salmon River | Yankee Fork Salmon River, tributary to Salmon River |
Section 3. Focal species
primary: Chinook Snake River Spring/Summer ESUsecondary: Steelhead Snake River ESU
Section 4. Past accomplishments
Year | Accomplishments |
---|---|
2005 | Monitoring and evaluation activites were completed to determine success of the enhancement activities. Data analyzed reveals that the habitat enhancements are successfull in reducing impacts to biotic community from habitat loss.Willows planted in Herd C |
2004 | Monitoring and evaluation activites were completed to determine success of the enhancement activities. Data analyzed reveals that the habitat enhancements are successfull in reducing impacts to biotic community from habitat loss.Willows planted in Herd C |
2003 | Monitoring and evaluation activites were completed to determine success of the enhancement activities. Data analyzed reveals that the habitat enhancements are successfull in reducing impacts to biotic community from habitat loss.Willows planted in Herd C |
2002 | Monitoring and evaluation activites were completed to determine success of the enhancement activities. Data analyzed reveals that the habitat enhancements are successfull in reducing impacts to biotic community from habitat loss.Willows planted in Herd C |
2001 | Monitoring and evaluation activites were completed to determine success of the enhancement activities. Data analyzed reveals that the habitat enhancements are successfull in reducing impacts to biotic community from habitat loss.Willows planted in Herd C |
2000 | Monitoring and evaluation activites were completed to determine success of the enhancement activities. Data analyzed reveals that the habitat enhancements are successfull in reducing impacts to biotic community from habitat loss.Willows planted in Herd C |
1999 | Monitoring and evaluation activites were completed to determine success of the enhancement activities. Data analyzed reveals that the habitat enhancements are successfull in reducing impacts to biotic community from habitat loss.Willows planted in Herd C |
1998 | Monitoring and evaluation activites were completed to determine success of the enhancement activities. Data analyzed reveals that the habitat enhancements are successfull in reducing impacts to biotic community from habitat loss.Willows planted in Herd C |
1997 | Monitoring and evaluation activites were completed to determine success of the enhancement activities. Data analyzed reveals that the habitat enhancements are successfull in reducing impacts to biotic community from habitat loss.Willows planted in Herd C |
1996 | Monitoring and evaluation activites were completed to determine success of the enhancement activities. Data analyzed reveals that the habitat enhancements are successfull in reducing impacts to biotic community from habitat loss.Willows planted in Herd C |
1995 | Monitoring and evaluation activites were completed to determine success of the enhancement activities. Data analyzed reveals that habitat enhancements are successfull in reducing impacts to biotic community from habitat loss. Willows planted in Herd Cr. |
1994 | Vertical banks in a cutoff channel in Big Boulder Creek were sloped, the stream was diverted away from high cut bank, returned to a more natural meander pattern within 0.5 km of affected floodplain, eliminating the cutoff channel as a sediment source |
1993 | Monitoring and evaluation activites were completed to determine success of the enhancement activities. Data analyzed reveals that the habitat enhancements are successfull in reducing impacts to biotic community from habitat loss. |
1992 | Fencing constructed on Herd Creek to discourage livestock use of streambank and riparian areas, thus improving streambank stability and reducing sediment input into stream |
1991 | Successful interconnection of four series of remenant dredge ponds within mainstem Yankee Fork Salmon River, creating over 1.5 ha of additional rearing habitat for anadromous fish |
1990 | Monitoring and evaluation activites were completed to determine success of the enhancement activities. Data analyzed reveals that the habitat enhancements are successfull in reducing impacts to biotic community from habitat loss. |
1989 | Reclamation of 2.5 km of floodplain in Bear Valley Creek eliminated substantial source of sediment into remaining 50 km of Stream and Middle for Salmon River |
Section 5. Relationships to other projects
Funding source | Related ID | Related title | Relationship |
---|---|---|---|
BPA | 198810804 | Streamnet (CIS/NED) | submit data from this project to streamnet |
BPA | 199401700 | Idaho Model Watershed Habitat | Participate in Upper Salmon Basin Watershed Porject Technical Team |
BPA | 199700100 | Idaho Chinook Salmon Captive R | share data and assist with monitoring activities for West Fork Yankee Fork Salmon River |
BPA | 200007300 | Subbasin Assessments | Participated in Upper Salmon River Subbasin Fisheries Technical Assessment Team |
BPA | 200205900 | Yankee Fork Salmon R Restorati | Assist in development and planning of project and share data on Yankee Fork |
BPA | 200600600 | Habitat Evaluation Project | advise and review for project |
BPA | Demo00001 | Demonstration Project | advise and review for South Fork Salmon River and Lemhi River Demonstration Projects |
PCSRF - Idaho | [no entry] | all SA projects | Assist in some capacity in review, implementation, evaluation of these projects thorough the Upper Salmon Basin Watershed Project Technical Team or intertribal participation |
Other: PCSRF | PCSRP | Tribal Resource Plan, Herd Creek 3 Diversion and Headgate Replacement Project, Salmon Supplementation Activi | Assist in these projects as needed though technical review and oversight |
BPA | 199107100 | Sockeye Salmon Hab & Limnologi | cooperation, equipment and data sharing, and field assistance |
BPA | 198909803 | Salmon Studies Id Rvrs SBT | Coordination of data collection, sharing of data, personnel, equipment as needed. |
Section 6. Biological objectives
Biological objectives | Full description | Associated subbasin plan | Strategy |
---|---|---|---|
1A | Increase the number of naturally spawning adults to achieve recovery goals within 24 years | Salmon | 1A1, 1A2, 1A3 |
1B | By the 4th field hydrologic unit, carry out focused activities designed to improve our understanding and definition of small populations, while protective the genetic integrity of wild populations that are below historic levels | Salmon | 2A1, 2A4, 2A7 |
23A | Where stream temperatures have been defined a high priority limiting factor, rehabilitate to levels that support current IDEQ designated beneficial use criteria | Salmon | 8C1-8C3 |
24A | Stabilize 10,000 feet (ISCC 1995) of streambank in Herd Creek focusing on areas where the stream exhibits excessive width:depth ratios | Salmon | 8C1-8C3 |
26A | Rehabilitate or mimic natural hydrograph of tributaries to the Upper Salmon R. | Salmon | 9A1-9A14 |
27A | Starting in critical habitat areas, reduce instream sedimentation to levels meeting applicable water quality standards and measures, with an established upward trend in the number of stream miles meeting such criterion by 2019. | Salmon | 10A1-10A8 |
3B | compare freshwater conditions among populations to more accurately define habitat rehabilitation needs | Salmon | [Strategy left blank] |
3C | address data gaps necessary to measure progress towards delisting and full recovery | Salmon | 3C1, 3C2, 3C3 |
Section 7. Work elements (coming back to this)
Work element name | Work element title | Description | Start date | End date | Est budget |
---|---|---|---|---|---|
BPA Environmental Compliance | NEPA and BiOp | [Work Element Description Not Entered] | 10/1/2006 | 3/31/2007 | $5,000 |
Biological objectives |
Metrics |
||||
Plant Vegetation | Willow Planting | In cooperation with the landowner, plant approximately 500 willows annually in Herd Creek Measure % survivorship of plated willows | 10/1/2006 | 9/30/2009 | $13,000 |
Biological objectives |
Metrics |
||||
Provide Public Access/Information | Provide public information | Maintain informational signs in Bear Valley Creek and Yankee Fork Install signs as needed in new implementation areas | 10/1/2008 | 9/30/2009 | $5,000 |
Biological objectives |
Metrics |
||||
Coordination | Coordination of Activities in Subbasin | Coordinate with those involved with fish and wildlife work Landowner coordination in Herd Creek, Smiley Creek, and Slate Creek | 10/1/2006 | 9/30/2009 | $10,000 |
Biological objectives |
Metrics |
||||
Identify and Select Projects | Identify and Select Projects | as member of USBWPTT participate in activities associated with this group mentioned | 10/1/2006 | 9/30/2009 | $6,000 |
Biological objectives |
Metrics |
||||
Manage and Administer Projects | Manage Administrate Activities for Project | Manage on the ground efforts, subcontractors, administrative work, complete metric reporting, financial reporting, and SOW package | 10/1/2006 | 9/30/2009 | $50,000 |
Biological objectives |
Metrics |
||||
Produce Design and/or Specifications | Produce feasability study | Subcontractors will prepare engineering design and specifications associated with the implementation actions in Smiley and Slate Creeks. | 10/1/2007 | 9/30/2008 | $100,000 |
Biological objectives |
Metrics |
||||
Produce Inventory or Assessment | Design and complete inventory and assessment | Using established and tested techniques; Smiley Creek - summarize available data, determine data gaps/needs and design complete inventory for analysis before and after implementation actions. Slate Creek - determine data gaps/needs and design complete inventory for monitoring before and after implementation actions. | 10/1/2006 | 9/30/2009 | $150,000 |
Biological objectives |
Metrics |
||||
Provide Technical Review | Provide Technical Review | review technical details associated with engineering and restoration plans, PNAMP/CSMEP RM&E methods | 10/1/2006 | 9/30/2009 | $7,924 |
Biological objectives |
Metrics |
||||
Produce Annual Report | Annual Report | produce annual progress report produce feasibility study report on Smiley and Slate Creek | 10/1/2006 | 9/30/2009 | $150,000 |
Biological objectives |
Metrics |
||||
Analyze/Interpret Data | Analyze/Interpret Data | Analyze and interpret data for evaluation of M&E activities and application to reports and publications | 10/1/2006 | 9/30/2009 | $300,000 |
Biological objectives |
Metrics |
||||
Collect/Generate/Validate Field and Lab Data | Collect/Generate/Validate Field and Lab Data | Data collection in areas of previous habitat enhancement efforts and in new areas to fill data gaps and begin M&E for before action. | 4/1/2007 | 9/30/2009 | $400,000 |
Biological objectives |
Metrics |
||||
Create/Manage/Maintain Database | Create/manage/maintain database | Create a MS Access database for long term dataset in Bear Valley Creek | 11/1/2007 | 4/30/2008 | $6,000 |
Biological objectives |
Metrics |
||||
Develop RM&E Methods and Designs | Develop and test methods | Work with the PNAMP/CSMEP to develop and test RM&E methods | 10/1/2006 | 9/30/2009 | $15,000 |
Biological objectives |
Metrics |
||||
Disseminate Raw/Summary Data and Results | disseminate data | Transfer summary reports, posters, redd maps and other data, tables, and/or figures to interested parties Present data at one professional scientific conference, minimally | 10/1/2006 | 9/30/2009 | $5,000 |
Biological objectives |
Metrics |
||||
Submit/Acquire Data | Submit Data to WWWeb | Transfer data to Streamnet and other databases as available/accessible | 10/1/2006 | 9/30/2009 | $5,000 |
Biological objectives |
Metrics |
Section 8. Budgets
Itemized estimated budget
Item | Note | FY07 | FY08 | FY09 |
---|---|---|---|---|
Personnel | Coordinator | $11,325 | $11,891 | $12,486 |
Personnel | Project Manager | $49,817 | $52,308 | $54,923 |
Personnel | Biologist | $40,950 | $42,998 | $45,147 |
Personnel | Senior Technician | $36,223 | $38,035 | $39,936 |
Personnel | Technician | $21,682 | $22,766 | $23,905 |
Personnel | 2 summer Technicians | $8,339 | $8,756 | $9,194 |
Personnel | Assistant | $1,092 | $1,147 | $1,204 |
Personnel | Clerk | $7,817 | $8,208 | $8,618 |
Fringe Benefits | 31% | $54,670 | $57,403 | $60,273 |
Travel | perdiem 6 people 100 days | $27,090 | $28,445 | $29,867 |
Travel | lodging | $462 | $485 | $509 |
Other | BPA training | $1,000 | $1,000 | $1,000 |
Other | professional meetings | $4,000 | $4,000 | $4,000 |
Other | vehicles | $18,238 | $18,602 | $18,974 |
Supplies | office and field supplies and equipment | $10,220 | $10,425 | $10,633 |
Other | Field trailer space rental | $1,050 | $1,050 | $1,050 |
Other | subcontractor | $50,000 | $50,000 | $0 |
Overhead | Indirect costs 28% | $64,936 | $68,183 | $71,592 |
Totals | $408,910 | $425,702 | $393,310 |
Total estimated FY 2007-2009 budgets
Total itemized budget: | $1,227,922 |
Total work element budget: | $1,227,924 |
Cost sharing
Funding source/org | Item or service provided | FY 07 est value ($) | FY 08 est value ($) | FY 09 est value ($) | Cash or in-kind? | Status |
---|---|---|---|---|---|---|
Idaho State University | equipmnet and laboratory use | $5,000 | $5,000 | $5,000 | In-Kind | Confirmed |
USDA Forest Service | Laboratory space in study area | $3,000 | $3,000 | $3,000 | In-Kind | Confirmed |
Totals | $8,000 | $8,000 | $8,000 |
Section 9. Project future
FY 2010 estimated budget: $1,400,000 FY 2011 estimated budget: $1,400,000 |
Comments: This was estimated based on other current restoration/enhancement projects in the area but is only a guess until more data becomes available. |
Future O&M costs: O&M was estimated for this section at $1,000,000 for each restortation action. This actual estimate will be available when the feasability studies are complete in 2007-8. Outyear M&E for all the project areas is estimated at 400,000-450,000.
Termination date:
Comments:
Final deliverables:
Section 10. Narrative and other documents
ISRP_review_SBT_Response_2006.doc | Jul 2006 |
Reviews and recommendations
FY07 budget | FY08 budget | FY09 budget | Total budget | Type | Category | Recommendation |
---|---|---|---|---|---|---|
NPCC FINAL FUNDING RECOMMENDATIONS (Oct 23, 2006) [full Council recs] | ||||||
$231,380 | $231,380 | $231,380 | $694,140 | Expense | ProvinceExpense | Fund |
NPCC DRAFT FUNDING RECOMMENDATIONS (Sep 15, 2006) [full Council recs] | ||||||
$231,380 | $231,380 | $231,380 | $0 | ProvinceExpense | ||
Comments: ISRP fundable in part. Remove habitat restoration work, and Bear Valley Creek monitoring and evaluation (per ISRP recommendation) |
ISRP PRELIMINARY REVIEW (Jun 2, 2006)
Recommendation: Fundable in part
NPCC comments: Two proposals in one cover might be better separated into different projects, at least until the new projects succeed into a routine monitoring mode following site modifications. Sponsors should be strongly acknowledged for past monitoring and its contribution to new proposed projects. New projects on Smiley and Slate creeks represent diffuse sediment/flow problems that are difficult to attack and probably of medium priority. Smiley Creek work includes "stabilizing" 10,000 ft of bank, but technique is unfortunately not described. If this is hand labor and minimally intrusive that is OK, but not so if requires heavy equipment and soil disturbance. Rampant spread of invasive plants may make weeds more of a problem on new re-grading sites more than in the past. This should be anticipated and prevented/controlled, especially given the hazard of downstream distributions of invasives during high water events. Funding for these project elements should depend on the absence of disturbance, and absence of risk for spread of invasive plants. Not only have they been monitoring relative to measured baselines, but they report some results. They do show some increase in resident species at some projects, but not for anadromous species. The sponsors need to spend more time convincing reviewers that the monitoring project should be continued. They show some changes before and after their habitat projects, but graphing the number of parr produced in different numbers of redds does not show that their work has been successful. These graphs should have a year associated with each point so that the parr produced at any level of redds can be examined. Also, the number of smolts produced each year should have been included in the program. It is likely that the number of smolts is largely determined by survival from parr to smolt, and these data provide no insight into whether or not the number of smolts has been increased at any density by their habitat enhancement efforts. In terms of habitat, the approaches seem based upon both science and experience, and address both physical and biological conditions in parallel. The relatively long run of data would, at first glance suggest that perhaps they have monitored long enough, but explaining the influences of events such as floods and changes in land and water use, justify continuing this monitoring well into the future. However, the Bear Valley monitoring probably does not need to be continued. Sponsors did not mention whether they are endeavoring to use "standardized" M&E protocol as was recommended by last ISRP review - is this still an issue? Excellent reporting to Streamnet and intent to publish in open literature is evident. There is reason now to monitor actual focal species as well as proxies, even though out-of-basin effects persist. Adaptive management is not directly addressed. One case is noted in which data collection was discontinued when not useful, but use of data to fine-tune procedures is not explicit. Good evidence of substantially improved communication and collaboration with other projects is evident. The narrative demonstrates close integration with projects, past, present and upcoming, under various sponsorships, not just BPA, and at varied scale. They should link up with the NOAA Habitat Effectiveness Pilot Study.
ISRP FINAL REVIEW (Aug 31, 2006)
Recommendation: Fundable in part
NPCC comments: This proposal is actually two proposals in one cover that would be better separated into different proposals. The ISRP recommends that only the monitoring component of this proposal is fundable, with the exception of that in Bear Valley Creek. The sponsors are strongly acknowledged for past monitoring and its contribution to new proposed projects, even if they are not justified as submitted. These proposed projects on Slate and Smiley Creeks address diffuse sediment/flow problems that are difficult to attack and probably of medium priority. Fine sediment in both creeks is high but no convincing evidence is given in the proposal or response that stabilizing two reaches of bank is the best approach. The justification cites the Subbasin Plan and the Sawtooth National Forest Plan. In fact, both mention a need to reduce sediment input, but the latter especially identifies grazing management as the most needed change. Reviewers recommend passive restoration over any “hard” approaches. The proposed projects in Slate and Smiley Creeks are not fundable. Project sponsors have submitted a reasonable argument for continuing the monitoring effort, but the Bear Valley Creek monitoring has run its course, and is no longer justified. It is stated that the Bear Valley experience will provide guidance for similar projects elsewhere. The argument that higher fish densities are associated with low fines must also acknowledge that low densities also occurred at low fines. Overall results are inconclusive, and it appears that project impacts have stabilized and there is no new information about project impacts to be gained from further monitoring here. In the case of the other monitoring, the relatively long run of data would, at first glance, suggest that perhaps they have monitored long enough, but explaining the influences of events such as floods and changes in land and water use justify continuing this monitoring well into the future. There is reason now to monitor actual focal species as well as proxies, even though out-of-basin effects persist. Adaptive management is not directly addressed, but should be. One case is noted in which data collection was discontinued when not useful, but use of monitoring data to improve projects is not explicit. Reporting to Streamnet and intent to publish in open literature is evident. Substantially improved communication and collaboration with other projects is apparent. The narrative demonstrates close integration with projects, past, present and upcoming, under various sponsorships, not just BPA, and at varied scale. They should investigate linking up with the Integrated Status and Effectiveness Monitoring Program (ISEMP) project #200301700 that is doing work in the Upper Salmon.