FY 2002 Innovative proposal 34004
Contents
Section 1. General administrative information
Section 2. Past accomplishments
Section 3. Relationships to other projects
Section 4. Budgets for planning/design phase
Section 5. Budgets for construction/implementation phase
Section 6. Budgets for operations/maintenance phase
Section 7. Budgets for monitoring/evaluation phase
Section 8. Budget summary
Reviews and Recommendations
Additional documents
Title | Type |
---|---|
34004 Narrative | Narrative |
Section 1. Administrative
Proposal title | Develop Computational Fluid Dynamics Model to Predict Total Dissolved Gas Below Spillways |
Proposal ID | 34004 |
Organization | ENSR International, Inc. (ENSR) |
Proposal contact person or principal investigator | |
Name | Charles E. "Chick" Sweeney, P.E. |
Mailing address | 9521 Willows Road NE Redmond, WA 98052 |
Phone / email | 4258817700 / [email protected] |
Manager authorizing this project | Alan R. Foster |
Review cycle | FY 2002 Innovative |
Province / Subbasin | Systemwide / Systemwide |
Short description | Develop a computational fluid dynamics model to predict total dissolved gas levels below spillways that can be used to manage operation of a particular project and/or to predict benefit of proposed structural changes prior to their implementation. |
Target species | All |
Project location
Latitude | Longitude | Description |
---|
Reasonable and Prudent Alternatives (RPAs)
Sponsor-reported:
RPA |
---|
Relevant RPAs based on NMFS/BPA review:
Reviewing agency | Action # | BiOp Agency | Description |
---|---|---|---|
NMFS | Action 133 | NMFS | As part of DGAS, the Corps shall complete development of a TDG model to be used as a river operations management tool by spring 2001. Once a model is developed, the applications and results shall be coordinated through the Water Quality Team. The Corps shall coordinate the systemwide management applications of gas abatement model studies with the annual planning process, the Transboundary Gas Group, the Mid-Columbia Public Utilities, and other interested parties. |
Section 2. Past accomplishments
Year | Accomplishment |
---|
Section 3. Relationships to other projects
Project ID | Title | Description |
---|
Section 4. Budget for Planning and Design phase
Task-based budget
Objective | Task | Duration in FYs | Estimated 2002 cost | Subcontractor |
---|
Outyear objectives-based budget
Objective | Starting FY | Ending FY | Estimated cost |
---|
Outyear budgets for Planning and Design phase
Section 5. Budget for Construction and Implementation phase
Task-based budget
Objective | Task | Duration in FYs | Estimated 2002 cost | Subcontractor |
---|---|---|---|---|
1) Develop a near-field CFD model that can predict total dissolved gas below spillways through a project-specific application to a section of the Bonneville Dam spillway. | a: Develop Computational Grid | 0.67 | $11,085 | |
2) Develop a near-field CFD model that can predict total dissolved gas below spillways through a project-specific application to a section of the Bonneville Dam spillway. | b: Simulate Free Surface Flow and Hydraulic Jump | 0.60 | $8,967 | |
3) Develop a near-field CFD model that can predict total dissolved gas below spillways through a project-specific application to a section of the Bonneville Dam spillway. | c: Grid Refinement and Sensitivity Analysis | 0.54 | $9,288 | |
4) Develop a near-field CFD model that can predict total dissolved gas below spillways through a project-specific application to a section of the Bonneville Dam spillway. | d: Develop Algorithm for Free Surface Air Transfer | 0.74 | $13,324 | |
5) Develop a near-field CFD model that can predict total dissolved gas below spillways through a project-specific application to a section of the Bonneville Dam spillway. | e: Simulate Transport of Air Bubbles | 0.50 | $7,822 | |
6) Develop a near-field CFD model that can predict total dissolved gas below spillways through a project-specific application to a section of the Bonneville Dam spillway. | f: Develop Algorithm for Mass Transfer From Bubbles | 0.83 | $17,628 | |
7) Develop a near-field CFD model that can predict total dissolved gas below spillways through a project-specific application to a section of the Bonneville Dam spillway. | g: Collect and Analyze Field Data | 12.2 | $5,155 | Yes |
8) Develop a near-field CFD model that can predict total dissolved gas below spillways through a project-specific application to a section of the Bonneville Dam spillway. | h: Determine Rate of Air Entrainment | 0.50 | $11,632 | |
9) Develop a near-field CFD model that can predict total dissolved gas below spillways through a project-specific application to a section of the Bonneville Dam spillway. | i: Develop Equation for Air Entrainment | 1.0 | $19,988 | |
10) Develop a near-field CFD model that can predict total dissolved gas below spillways through a project-specific application to a section of the Bonneville Dam spillway. | j: Validate Equation for Air Entrainment | 0.84 | $17,642 | |
11) Make the model formulation, techniques, and user defined subroutines available to others throughout the regions via general documentation of the study in a report and through conference presentations and a journal article. | k: Analyze Model Results | 0.67 | $15,501 | |
12) Make the model formulation, techniques, and user defined subroutines available to others throughout the regions via general documentation of the study in a report and through conference presentations, a journal article, presentation to BAP and USACE. | l: Reporting and Presentation | 1.83 | $61,966 |
Outyear objectives-based budget
Objective | Starting FY | Ending FY | Estimated cost |
---|
Outyear budgets for Construction and Implementation phase
Section 6. Budget for Operations and Maintenance phase
Task-based budget
Objective | Task | Duration in FYs | Estimated 2002 cost | Subcontractor |
---|
Outyear objectives-based budget
Objective | Starting FY | Ending FY | Estimated cost |
---|
Outyear budgets for Operations and Maintenance phase
Section 7. Budget for Monitoring and Evaluation phase
Task-based budget
Objective | Task | Duration in FYs | Estimated 2002 cost | Subcontractor |
---|
Outyear objectives-based budget
Objective | Starting FY | Ending FY | Estimated cost |
---|
Outyear budgets for Monitoring and Evaluation phase
Section 8. Estimated budget summary
Itemized budget
Item | Note | FY 2002 cost |
---|---|---|
Personnel | FTE: 0.978 | $185,886 |
Fringe | Included in Personnel | $0 |
Travel | $3,300 | |
Other | Computer, postage, phone, etc | $10,812 |
$199,998 |
Total estimated budget
Total FY 2002 cost | $199,998 |
Total FY 2002 budget request | $199,998 |
Cost sharing
Organization | Item or service provided | Amount | Cash or in-kind |
---|---|---|---|
USACE, Portland | Field Data Collection | $405,000 | in-kind |
Reviews and recommendations
This information was not provided on the original proposals, but was generated during the review process.
Comment:
This tenth ranked proposal is innovative, technically excellent, and covers an important topic. The proposal meets a regional need in adapting and applying well-known methods and software to help the region better understand the benefits and consequences of spill events and to forecast the effects of changes in spillway configurations designed to reduce gas supersaturation.Computational Fluid Dynamics (CFD) models are being used for many hydraulic applications, and it is logical to try it here. The adaptation is innovative in that it combines deterministic equations with limited use of statistical models to understand the magnitude and distribution of dissolved gases below spillways. The logic for the model seems good. The proponents are well qualified to do the work, and the collaboration between ENSR and the Corps is an excellent mix of interests, capabilities, and eventual users.
The problem of modeling air entrainment in the plunge pool is particularly important to solve. The basic concept that mass exchange of gas between bubbles and water is an equilibrium process where the history of bubbles entrained below the spillway in time controls the TDG below the spillway has a firm basis in physical science. The success of the modeling effort will be tested against data at Bonneville Dam spillway, but Bonneville Dam may not be the best place to test this model.
The original submittal did not meet the cost limitations of the solicitation.
Comment:
This proposal did not meet the criteria outlined in the solicitation package. The proposal is redundant to activities that are already occurring through the FCRPS BiOp. There is already a MASS 2 numerical model and a SYSTDG spreadsheet model that have been developed for this purpose.Comment:
Statement of Potential Biological BenefitIndirect benefits. Potentially improves water quality by developing a model to evaluate design and operational concepts for reducing TDG generated by spillway operations at FCRPS projects and other dams. Has the potential to reduce mortality caused by high TDG levels.
Comments
The proposal is redundant to activities that are already occurring through the FCRPS BiOp. There is already a MASS 2 numerical model and a SYSTDG spreadsheet model that have been developed for this purpose. The ISRP was more supportive and gave the proposal a #10 ranking because they felt that modeling air entrainment in the plunge pool is particularly important to solve.
Already ESA Required?
No
Biop?
Yes
Comment:
Statement of Potential Biological Benefit to ESUIndirect benefits. Potentially improves water quality by developing a model to evaluate design and operational concepts for reducing TDG generated by spillway operations at FCRPS projects and other dams. Has the potential to reduce mortality caused by high TDG levels.
Comments
The proposal is redundant to activities that are already occurring through the FCRPS BiOp. There is already a MASS 2 numerical model and a SYSTDG spreadsheet model that have been developed for this purpose. The ISRP was more supportive and gave the proposal a #10 ranking because they felt that modeling air entrainment in the plunge pool is particularly important to solve.
Already ESA Req? No
Biop? Yes