Proposal title | Dworshak Impacts/M&E and Biological/Integrated Rule Curves |
Proposal ID | 198740700 |
Organization | Nez Perce Tribe (NPT) |
Proposal contact person or principal investigator |
Name | David P. Statler |
Mailing address | 3404 Highway 12 Orofino, ID 83544 |
Phone / email | 2084767417 / [email protected] |
Manager authorizing this project | Silas Whitman |
Review cycle | FY 2001 Ongoing |
Province / Subbasin | Mountain Snake / Clearwater |
Short description | Assemble and assess thermal, physical, chemical, primary production, zooplankton, benthic, and fish data to formulate and refine biological/integrated rule curves for Dworshak Dam and Reservoir, and to monitor/evaluate rule curve implementation. |
Target species | |
Year | Accomplishment |
1988 |
Annual Report: Dworshak Investigations: trout, bass and forage species. Nez Perce Tribe Department of Fisheries Resources Management, Annual Report to Bonneville Power Administration, Contract DE-AI79-87BP35165, Project 87-407, Portland, OR. |
1989 |
Annual Report: Dworshak Investigations: trout, bass and forage species. Nez Perce Tribe Department of Fisheries Resources Management, Annual Report to Bonneville Power Administration, Contract DE-AI79-87BP35165, Project 87-407, Portland, OR. |
1990 |
Annual Report: Dworshak Investigations: trout, bass and forage species. Nez Perce Tribe Department of Fisheries Resources Management, Annual Report to Bonneville Power Administration, Contract DE-AI79-87BP35165, Project 87-407, Portland, OR. |
1992 |
Resident Fish Work Group member and Resident Fish Technical Appendix contributor providing Dworshak Reservoir expertise for the BPA, USACE, USBR Columbia River System Operation Review. |
1993 |
Final Report: Dworshak Dam impact assessment and fishery investigation and trout, bass, and forage species. Final Report. Bonneville Power Administration, Portland, OR. |
1993 |
Resident Fish Work Group member and Resident Fish Technical Appendix contributor providing Dworshak Reservoir expertise for the BPA, USACE, USBR Columbia River System Operation Review. |
1993 |
Interim Report: Primary productivity evaluation of Dworshak Reservoir: first interim report. Prepared for the Nez Perce Tribe, WSU Project Number 11W-3815-2857, Pullman, WA. |
1994 |
Resident Fish Work Group member and Resident Fish Technical Appendix contributor providing Dworshak Reservoir expertise for the BPA, USACE, USBR Columbia River System Operation Review. |
1996 |
Interim Report: A limnological reevaluation of Dworshak Reservoir, Idaho. A Progress Report Prepared for the Nez Perce Tribe and the U.S. Army Corps of Engineers, WSU Project Numbers 11W-3815-2857 and 11W-3998-2628, Pullman, WA. |
1997 |
Provided public presentation of project summary and update for the 1997 Review of Projects, Portland, OR. |
1998 |
Provided public presentation of project summary and update for the 1998 Clearwater Subbasin Review of Projects, Lewiston, ID. |
1999 |
Initiated subcontracts with Washington State University limnologist and hydrologic modeler to construct a PC-based Dworshak specific production model using Montana's HRMOD model template. |
Objective | Task | Duration in FYs | Estimated 2001 cost | Subcontractor |
1. Finalize Dworshak Reservoir integrated rule curve |
a. Coordinate with management and regulatory agencies to address concerns relative to the draft integrated rule curve recommendation.. |
1 |
$14,480 |
|
|
b. Coordinate with Corps of Engineers regarding adoption of "Var Q" flood control operations for Dworshak.. |
1 |
$14,480 |
|
|
c. Coordinate with NMFS regarding BIOP operations. |
1 |
$14,480 |
|
|
d. Following a-c, prepare and present final integrated rule curve recommendation to NPPC |
1 |
$4,826 |
|
2. Institute rule curve recommendations |
e. Promote recognition and adoption of rule curve criteria through participation in regional water management forums, such as FPAC, TMT and IT. |
73 |
$24,133 |
|
3. Monitor dam and reservoir operations. |
f. Use regional water management forums and internet resources to monitor Dworshak pool elevations and dam discharges to evaluate agreeance with rule curve recommendations. |
73 |
$10,055 |
|
|
g. Employ model to help quantify impacts from diverging from rule curve recommendations. |
73 |
$20,111 |
|
4. Develop parameter specific, prioritized monitoring and evaluation plan for Dworshak Reservoir, based on analyses of previous collection efforts and rule curve modeling results. |
h. Identify data monitoring and evaluation needs to refine biological/integrated rule curve. |
2 |
$12,066 |
|
|
i. Identify data monitoring and evaluation needs to assess measurable biological objectives |
1 |
$6,036 |
|
Field data collection activities have been omitted..
Field data collection terminated in prior year (FY 2000).
This information was not provided on the original proposals, but was generated during the review process.