FY 2001 Ongoing proposal 199700900

Additional documents

TitleType

Section 1. Administrative

Proposal titleEvaluate Rebuilding the White Sturgeon Population in the Lower Snake Basin
Proposal ID199700900
OrganizationNez Perce Tribe (NPT)
Proposal contact person or principal investigator
NameMichael A. Tuell
Mailing addressP. O. Box 365 Lapwai, ID 83540
Phone / email2088437320 / [email protected]
Manager authorizing this projectSilas Whitman
Review cycleFY 2001 Ongoing
Province / SubbasinBlue Mountain / Mainstem Snake
Short descriptionEvaluate the need for and identify potential measures to protect and restore white sturgeon between Hells Canyon and Lower Granite dams to obtain a sustainable annual harvest of white sturgeon.
Target species
Project location
LatitudeLongitudeDescription
Reasonable and Prudent Alternatives (RPAs)

Sponsor-reported:

RPA

Relevant RPAs based on NMFS/BPA review:

Reviewing agencyAction #BiOp AgencyDescription

Section 2. Past accomplishments

YearAccomplishment
1996 Upper Snake River White Sturgeon Biological Assessment
1997 NPT White Sturgeon Multi-Year Research Plan
1997 Annual report
1998 Annual Report
1999 Initiated white sturgeon telemetry study
1999 Initiated white sturgeon egg recovery study
2000 Hosted regional white sturgeon research coordination conference
2000 Initiated white sturgeon young-of-the-year sampling study

Section 3. Relationships to other projects

Project IDTitleDescription

Section 4. Budget for Planning and Design phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Planning and Design phase

Section 5. Budget for Construction and Implementation phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
1. Evaluate the need for and identify potential actions for protecting and restoring populations to mitigate for effects of hydropower on white sturgeon productivity. a. Conduct a biological assessment. Completed (Carmichael et. al. 1997) 1996-1997 $0
2. Determine the status and characteristics ( reproductive and early life history of the Snake River white sturgeon population between Hells Canyon and Lower Granite Dams, including the major tributaries (Clearwater and Salmon rivers). a. Estimate white sturgeon abundance throughout entire study area and determine if there has been any marked change in abundance or age structure of the population over the last 25 years. 1997-2001 $288,811
b. Identify spawning behavior and movements of gravid females and mature males before, during, and after spawning. Identify spawning locations. 1999-2002 $14,294
c. Verify spawning activities, timing, and locations. 1999-2002 $18,938
d. Determine distribution/movements of fish, abundance of various age classes of white sturgeon per reach throughout the system and determine life history characteristics to be used in modeling population dynamics. 1999-2002 $33,142
3. Determine habitat used for spawning and rearing of white sturgeon in the Snake River between Lower Granite and Hells Canyon Dams, including major tributaries (Clearwater and Salmon Rivers). a. Describe environmental conditions at locations where sub-adult and adult fish are captured in conjunction with tasks 1.1, 1.2, and 1.4. 1997-2002 $23,673
4. Coordination with fisheries co-managers and funding entities and dissemination of information. a. Attendance of regional white sturgeon technical/management meetings. 1996-2017 $14,115
b. Data compilation and report writing. 1996-2003 $80,488
5. Develop an adaptive management plan. a. Fully assess the risks associated with mitigative actions using information collected. 2002-2003 $0
b. Make recommendations for implementation of mitigative action(s). 2003 $0
c. Develop an implementation, evaluation and monitoring plan. 2003 $0
6. Restore population to provide an annual sustainable harvest of 5 kg/ha/yr. a. Implementation of mitigative action(s). 2004-2014 $0
b. Evaluate and monitor effectiveness of action(s) by quantifying changes in population. 2014-2017 $0
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Construction and Implementation phase
FY 2004FY 2005FY 2002FY 2003
$250,000$500,000$250,000$250,000

Section 6. Budget for Operations and Maintenance phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Operations and Maintenance phase

Section 7. Budget for Monitoring and Evaluation phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Monitoring and Evaluation phase

Section 8. Estimated budget summary

Itemized budget
ItemNoteFY 2001 cost
Personnel FTE: 8 $243,752
Fringe $55,929
Supplies $33,446
Travel $26,100
Indirect @26.6% $95,554
Capital $0
NEPA $0
Subcontractor telemetry flights $18,680
$473,461
Total estimated budget
Total FY 2001 cost$473,461
Amount anticipated from previously committed BPA funds$0
Total FY 2001 budget request$473,461
FY 2001 forecast from 2000$410,000
% change from forecast15.5%
Reason for change in estimated budget

The indirect cost for FY2001 increased 3.2% increase. A more accurate calculation of fringe resulted in a 2.8 % increase. Salary increased by 9.4% because we upgraded the field crew to technicians.

Cost sharing
OrganizationItem or service providedAmountCash or in-kind

Reviews and recommendations

This information was not provided on the original proposals, but was generated during the review process.

Recommendation:
Date:
Jul 14, 2000

Comment:


Recommendation:
Fund
Date:
Sep 13, 2000

Comment:

Rationale: Budget increase inappropriate in this review.
REVIEW:
NW Power and Conservation Council's FY 2006 Project Funding Review
Funding category:
expense
Date:
May 2005
FY05 NPCC start of year:FY06 NPCC staff preliminary:FY06 NPCC July draft start of year:
$284,350 $0 $0

Sponsor comments: See comment at Council's website