FY 2001 Ongoing proposal 199701900

Additional documents

TitleType

Section 1. Administrative

Proposal titleEvaluation of the Life History of Native Salmonids in the Malheur Basin
Proposal ID199701900
OrganizationBurns Paiute Tribe (BPT)
Proposal contact person or principal investigator
NameLawrence Schwabe
Mailing addressHC 71 100 Pasigo St Burns, OR 97720
Phone / email5415731375 / [email protected]
Manager authorizing this projectDaniel Gonzalez
Review cycleFY 2001 Ongoing
Province / SubbasinMiddle Snake / Malheur
Short descriptionEvaluate and determine the life history, distribution, and critical habitats pertinent to populations of redband and bull trout in the Middle Fork Malheur subbasin.
Target species
Project location
LatitudeLongitudeDescription
Reasonable and Prudent Alternatives (RPAs)

Sponsor-reported:

RPA

Relevant RPAs based on NMFS/BPA review:

Reviewing agencyAction #BiOp AgencyDescription

Section 2. Past accomplishments

YearAccomplishment
1998 Identified new bull trout spawning area (tributary) that did not have previous documentation for bull trout spawning.
1998 USFS changed cattle allotments into sheep allotments to protect bull trout spawning habitat.
1999 Documented entrainment over Agency Dam.
1999 Angling regulations changed to artificial lure and fly only to protect bull trout and redband trout from incidental angling mortality.
2000 Bureau of Reclamation is changing spill operation at Beulah Reservoir to reduce entrainment. Research is now being done to develop alternatives.

Section 3. Relationships to other projects

Project IDTitleDescription

Section 4. Budget for Planning and Design phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
1.) Document the complete migratory patterns of bull trout in the Malheur basin at and above Warm Springs Reservoir and Beulah Reservoir. e.) Weir traps will be placed on the Middle Fork Malheur River which is designated "Wild and Scenic". The USFS will complete all necessary documents for the installation of the weir traps. 4 $0
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Planning and Design phase

Section 5. Budget for Construction and Implementation phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
1.) Document the complete migratory patterns of bull trout in the Malheur basin at and above Warm Springs Reservoir and Beulah Reservoir. a.) Radio tag 20 bull trout and PIT tag about 100 that are captured at the weir trap in the Middle Fork Malheur River. 4 $65,650
b.) Snorkel with dipnets and use hook and line survey for bull trout in tributaries to the Middle Fork Malheur; PIT bull trout larger than 150 mm and radio tag fish if necessary. (Costs included in Objective 1, task a.) 1 $0
c.) Recapture PIT tagged fish in the weir trap, by angling, and by snorkeling with dipnets (Cost included in Objective 1, Task a). 1 $0
d.) Use radio telemetry to track migration patterns of bull trout in the Middle Fork Malheur basin. 4 $34,240
2.) Determine population trends and age class structures in bull trout and redband trout a. ) Continue monitoring spawning activity in documented areas and any new areas identified through the use of radio telemetry (Cost included in Objective 1, task b). 4 $0
b.) Determine population trend of adult bull trout spawners by past and present spawning surveys. 4 $13,800
c.) Gather scale samples from bull and redband trout caught during the project (Cost for collecting samples are included in objective 1.a, ODFW will do the analysis of scales). 4 $0
3.) Determine water quality parameters in the Malheur basin. a.) Continue using thermographs to gather data on established sites. 4 $1,229
4.) Determine the timing of spawning and preferred spawning sites. b.) Continue monitoring the locations and timing of bull trout spawning activities via radio telemetry in the Middle Fork Malheur and tributaries. (Cost included in Objective 1, task d). 1 $0
c.) GPS all redds counted in the spawning surveys and enter into GIS to determine spawning site preference (Cost included in Objective 2, task b). 4 $0
5.) Determine bull trout use of Warm Springs and Beulah Reservoir and fish entrainment a.) Track downstream migration on all radio tagged bull trout until radio expire (Costs included in Objective 1, task d). 4 $0
6.) Evaluate the habitat profile of critical bull trout spawning and rearing tributaries in the Malheur basin. a.) Stream survey using ODFW 2000 protocol; approximately 30+ miles of mainstem habitat will be surveyed 4 $0
b.) Electroshock streams which have suspected or potential bull trout populations 4 $0
7.) Determine the genetic variability of redband trout within the Middle Fork Malheur River and Warm Springs Reservoir a.) Gather 60 samples from the Middle Fork tributaries, 60 from the weir trap located in the mainstem, and 60 samples from Warm Springs Reservoir that are to be analyzed by the University of Montana 1 $0
8.) Determine cold water micro-refugia within the Middle Fork Malheur Basin a.) Snorkel cold water micro-habitats identified from FLIR data and determine bull and redband trout utilization. 1 $0
9.) Progress Reports Data entry, data analysis, and report writing 4 $42,000
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Construction and Implementation phase
FY 2003FY 2004FY 2002
$155,000$155,000$155,000

Section 6. Budget for Operations and Maintenance phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
9) Progress Reports Data entry, data analysis, written reports (costs only include office expenses (i.e. telephone, electrical costs postage, office supplies building insurance, e-mail fees, photo development) and administration costs) 3 $52,077
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Operations and Maintenance phase
FY 2003FY 2004FY 2002
$55,000$55,000$55,000

Section 7. Budget for Monitoring and Evaluation phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Monitoring and Evaluation phase

Section 8. Estimated budget summary

Itemized budget
ItemNoteFY 2001 cost
Personnel $86,730
Fringe @ 32% $27,754
Supplies vehicle lease, fisheries supplies (weir material, ATS radio transmitters, hip wader, propane) $25,755
Travel Mileage, field per diem $16,440
PIT tags # of tags: 100 $240
Supplies Office supplies, utilities, insurance $9,000
Indirect Indirect Cost 26% $43,077
$208,996
Total estimated budget
Total FY 2001 cost$208,996
Amount anticipated from previously committed BPA funds$0
Total FY 2001 budget request$208,996
FY 2001 forecast from 2000$200,000
% change from forecast4.5%
Reason for change in estimated budget

An increase in fringe from 25% to 32% accounts for a total increase of about $7,000 in the FY 01 budget.

Reason for change in scope

NA

Cost sharing
OrganizationItem or service providedAmountCash or in-kind

Reviews and recommendations

This information was not provided on the original proposals, but was generated during the review process.

Recommendation:
Date:
Jul 14, 2000

Comment:


Recommendation:
Fund
Date:
Sep 13, 2000

Comment:


REVIEW:
NW Power and Conservation Council's FY 2006 Project Funding Review
Funding category:
expense
Date:
May 2005
FY05 NPCC start of year:FY06 NPCC staff preliminary:FY06 NPCC July draft start of year:
$333,542 $333,542 $333,542

Sponsor comments: See comment at Council's website