Proposal titleHood River Fish Habitat Project
Proposal ID199802100
OrganizationConfederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO)
Proposal contact person or principal investigator
NameAlexis Vaivoda
Mailing address3430 W 10th The Dalles, OR 97058
Phone / email5412966866 / [email protected]
Manager authorizing this projectMick Jennings
Review cycleFY 2001 Ongoing
Province / SubbasinColumbia Gorge / Hood
Short descriptionImplement habitat improvement actions that will support supplementation efforts and wild fish within the Hood River subbasin as approved by the NPPC and supported by the BPA Environmental Impact Statement for the Hood River Production Program (HRPP).
Target species
Project location
LatitudeLongitudeDescription
Reasonable and Prudent Alternatives (RPAs)

Sponsor-reported:

RPA

Relevant RPAs based on NMFS/BPA review:

Reviewing agencyAction #BiOp AgencyDescription

Section 2. Past accomplishments

YearAccomplishment
1996 Completed 0.5 miles of riparian fence exclosure on Neal Creek (Kirby property). Cattle are excluded from the riparian and the riparian has been recovering.
1996 Completed 75 feet of bioengineered rip rap, which included vegetative plantings, on Neal Creek (Kirby property). Bank stabilized and allowed to recover.
1998 Completed 1.2 miles of riparian fence exclosure on Neal Creek (Guisto and Meyers property). Cattle are excluded from the riparian and the riparian has been recovering.
1998 Completed 75 feet of bioengineered rip rap, which included vegetative plantings, on Neal Creek (Guisto property). Bank stabilized and allowed to recover.
1998 Planted 130 ponderosa pine and 12 Douglas fir conifer seedlings on Neal Creek (Kirby property). Ninety percent survival through 1999. Thinned seedlings and moved to other fence enclosure locations.
1998 Removed a portion of the Tony Creek Dee Mill diversion concrete apron, removed stop logs, and constructed a jump pool providing access to three stream miles for spring chinook salmon, winter steelhead, bulltrout, and resident trout.
1998 Completed a preliminary feasibility evaluation for the East Fork Irrigation District in developing a pipe bypass system on Neal Creek. Upon construction will eliminate the need for a diversion and irrigation canal screen on Neal Creek.
1999 Completed 100 feet of bioengineered rip rap, which included vegetative plantings, on Neal Creek (Meyers property). Bank stabilized and allowed to recover.
1999 Eliminated the lower Evans Creek irrigation diversion (Higgins pond) operated by Middle Fork Irrigation District by constructing a gravity fed pressure pipe system which restored two miles of access for winter steelhead, salmon, and resident trout habitat
1999 Transplanted 40 Ponderosa pine (3-yr olds) from the Kirby property, planted 40 Douglas fir conifer seedlings, 200 Red Osier Dogwood, and grass seed on Neal Creek (Guisto property) for bank stabilization and riparian vegetation restoration.
1999 Completed 0.5 miles of riparian fence exclosure on Lenz Creek, tributary to Neal Creek (VanKoten property). Cattle are excluded from the riparian and the riparian has been recovering.
1999 Completed the Hood River Watershed Assessment.
2000 Completed the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan.

Section 3. Relationships to other projects

Project IDTitleDescription

Section 4. Budget for Planning and Design phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Planning and Design phase

Section 5. Budget for Construction and Implementation phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
1. Restore and recover habitat lost as a consequence of man's activities in the Hood River subbasin (see Hood River / Fifteenmile Creek Umbrella proposal 1-3, strategy g - FY 2000 process) a. Describe habitat constraints: review watershed assessments and subbasin plans, existing biological data, land management regulations, and current production and harvest management practices. Ongoing $4,660
1 b. Identify habitat improvement projects; describe benefits associated with each projects; and prepare a prioritized list of habitat improvement projects from the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. Ongoing $5,445
1 c. Plan and develop habitat improvement projects. Ongoing $2,800
1 d. Implement habitat improvement projects. See subcontractors listed in the itemized estimated budget below. Ongoing $278,743 Yes
1 e. Monitor and evaluate the physical and biological recovery associated with the habitat improvement projects. Ongoing $4,186
1 f. Coordination and administration oversight. Ongoing $4,119
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Construction and Implementation phase
FY 2005FY 2003FY 2004FY 2002
$300,000$500,000$400,000$500,000

Section 6. Budget for Operations and Maintenance phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Operations and Maintenance phase

Section 7. Budget for Monitoring and Evaluation phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Monitoring and Evaluation phase

Section 8. Estimated budget summary

Itemized budget
ItemNoteFY 2001 cost
Personnel $7,833
Fringe @ 23% $1,802
Supplies $6,315
Indirect @ 41.4% $6,603
NEPA $3,400
Subcontractor East Fork Irrigation District (Neal Creek Invert Syphon and Lateral Canal Piping - Engineering Phase $230,000
Subcontractor Hood River Soil & Water Conservation District (HRSWCD Cost Share-Watershed/Habitat Coordinator) $10,000
Subcontractor Baldwin Creek Passage Projects (Culvert and Water Diversion Modifications) $30,000
Subcontractor Northwest Service Academy - AmeriCorp (Baldwin Creek Fencing Projects) $4,000
$299,953
Total estimated budget
Total FY 2001 cost$299,953
Amount anticipated from previously committed BPA funds$0
Total FY 2001 budget request$299,953
FY 2001 forecast from 2000$300,000
% change from forecast0.0%
Cost sharing
OrganizationItem or service providedAmountCash or in-kind

Reviews and recommendations

This information was not provided on the original proposals, but was generated during the review process.

Recommendation:
Ongoing Funding: yes; New Funding: no
Date:
Jul 14, 2000

Comment:

There is no change in the budget from that estimated for FY 2001, and there is no change in the scope of work.
Recommendation:
Fund
Date:
Sep 13, 2000

Comment:

Rationale: Budget increase inappropriate in this review. Project expansion should be determined in provincial review
Recommendation:
Fund
Date:
Sep 20, 2003

Comment:

Project just finished last week for accruals, work in September will be large, 194K in billings that not sure what has happened. Work for 04 and 05 similar to work done in previous years.
Recommendation:
Date:
Sep 20, 2003

Comment:

No comment submitted
REVIEW:
NW Power and Conservation Council's FY 2006 Project Funding Review
Funding category:
expense
Date:
May 2005
FY05 NPCC start of year:FY06 NPCC staff preliminary:FY06 NPCC July draft start of year:
$699,626 $699,626 $699,626