Title of project
Computational Fluid Dynamics Application in Fish Screen Modeling
BPA project number 5503900
Business name of agency, institution or organization requesting funding
Clouston Energy Research
Sponsor type OR-Consultant
Proposal contact person or principal investigator
Name | Sidney N. Clouston, Jr. | |
Mailing address | Clouston Energy Research
7846 S.W. 171st Place Beaverton, OR 97007 | |
Phone | 503/642-1886 |
BPA technical contact , EWI
Biological opinion ID
NWPPC Program number
Short description
Computer modeling with National Aeronautical and Space Administration's (NASA-Ames Research Center) INS3D award winning Computational Fluid Dynamics (CFD) software. Used for the verification of a self-cleaning fish screen for both small, medium and large water intake sites.
Project start year 1997 End year 1997
Start of operation and/or maintenance 0
Project development phase Implementation
Section 2. Narrative
Related projects
Project history
Biological results achieved
Annual reports and technical papers
Management implications
Specific measureable objectives
Specific geometry to effect laminar flow pattern in a fluid medium, in this case water. The computational fluid dynamic (CFD) study will contain the elements of computer aided design (CAD) to be applied to hardware fabrication and physical testing. The work will improve fish transport and their safety near water intake sites. It will achieve cost effective fish screen cleaning, thus improved intake reliability. The maintaining of intact fish screens will therefore, reduce fish mortality.
Testable hypothesis
In a fluid medium, geometry have been studied which effect the fluid's flow pattern. Since Bernoulli's principal and its application, to current laminar flow studies at NASA Research Centers and elsewhere, advancements continue in the dynamics of fluid boundary behavior. Lift occurs because of the increase of fluid speed over the curvature of geometry of airfoil and hydrofoils. It will provide a fluid "conveyer belt" due to laminar flow and application of Bernoulli's principal.
Underlying assumptions or critical constraints
One assumption to be tested by the three dimensional CFD model, is in regards to the safe transport of fish somewhat beyond the intake approach flow. The major source of the fluid intate is from the lower (reservoir) area of the fluid body. And not from the top one-third area of the fluid body where the migrating salmon mainly travels. Laminar flow patterns can transport fish and debris down stream to a point of equal force between the intake and streamline flow.
One constraint is the navigation of the river, because of the screen/intake water depth during a low water year makes site location a critical factor.
Methods
Applications of the factors and forces involved with improved understanding in their application to intake sites and Hydroelectric Dam structures, bypass and gate designs may allow future upgrades. Please envision an airfoil like structure something like an oval clam shell. Perhaps it has an "overbite" which will change flow patterns. A large intake pipe is attached to a dual orifice like a "U" or a "Y" on a horizontal plane in that somewhat opened "clam shell". The intake site will alternate between the two orifice of the structure. Within the orifices there is a "shunt" between them which will allow a back flow of water that enters the opened intake side. The internal shunt will back flush the screen, dislodging any debris on the screen face, on one side relative to the other due to a relaxing of the fluid flow pressure and change of flow pattern on the screen. Above the structure laminar flow patters (streamline) will transport fish beyond the screen area.
Brief schedule of activities
I. A National Aeronautical and Space Administration donation of the software INS3D an award winning three dimensional computational fluid dynamics software to Portland State University. (Contacts; PSU-Prof. Shoguang Li, Prof. Scott Wells Civil Engineering Dept. NASA-Ames, Dr. Dochan Kwak)
Note: The item above has been accomplished.
II. The three dimensional study of a fish screen discussed above.
III. Physical construction in Battelle's lab and/or a field test.
Biological need
Surveys by the U.S. Army Corps of Engineers have shown that intake sites tend to be in need of repair, replacement or fit with screens. Mortality of fish will be reduced if the screens are used and not left open or if repaired and upgraded.
Critical uncertainties
None identified.
Summary of expected outcome
The expected outcome of the improved fish screen system is first, to improve the salmon survival past man made devices. Secondly, a self-cleaning fish screen will lower maintenance cost due to lower maintenance and cleaning requirements.
Dependencies/opportunities for cooperation
NASA's program called "Mission To The Planet Earth" can number this effort as another way of the "down to Earth" benefits that they are drivers of. Future Civil Engineering students of Prof. Li and Prof. Wells as well as Mechanical Engineering students of Chairman/Prof. Migliore may become more knowledgeable of the requirements of the Fish and Wildlife Division of Bonneville and the Northwest Power Planning Council. as we tackle the problem of fish screen design. Dr. Li and his students at Portland State University have the INS3D software/codes sent from NASA-Ames Research Center to become familiar with it.
Battelle Pacific Northwest Laboratory with Duane Neitzel can support the project with the lab facilities for physical testing at the lab or field test and monitoring.
NASA has a Scientist exchange program which could create future benefits.
Risks
None identified.
Monitoring activity
Discussion with Battelle has included monitoring activity for a initial period. Continuing monitoring will be an operation and maintenance requirement.
Section 3. Budget
Data shown are the total of expense and capital obligations by fiscal year. Obligations for any given year may not equal actual expenditures or accruals within the year, due to carryover, pre-funding, capitalization and difference between operating year and BPA fiscal year.Historic costs | FY 1996 budget data* | Current and future funding needs |
(none) | New project - no FY96 data available | 1997: 150,000 |
* For most projects, Authorized is the amount recommended by CBFWA and the Council. Planned is amount currently allocated. Contracted is the amount obligated to date of printout.
Funding recommendations
CBFWA funding review group Mainstem
Recommendation Tier 2 - fund when funds available
Recommended funding level $150,000